



Project 10
70t Bollard and temporary mooring hooks for ferry terminal in the same project

Project 11
Model design, fabricate, load test, shot blast and paint access man baskets complete with certified rigging.

Project 12
Model fabricate supply and erect steel framed powerhouse for hydro scheme complete with 20t chain blocks.

Project 13
Design model fabricate pedestrian access bridge.

Project 14
Model design plasma cut and fabricate bespoke handrail panels for residential installation.

Project 15
Model fabricate supply and erect two sawmill buildings.

Project 16
Model, fabricate supply and erect workshop extension complete with composite roof and wall cladding.






